Project Plan vs. Actual per Task

Filtering
Medium
projects
planning-lines
ledger-entries
calcsums

Project Plan vs. Actual per Task

The project manager wants a per-task progress readout: how much work was planned, how much has actually been posted, and how much is left. Sounds like three numbers per task — until you notice that on some projects the ready-made "posted so far" figures are frozen at zero while the ledger keeps filling up.

Requirements

Create a codeunit named "Project Plan vs Actual" with three public procedures:

procedure PlannedQty(ProjectNo: Code[20]; ProjectTaskNo: Code[20]): Decimal
procedure PostedQty(ProjectNo: Code[20]; ProjectTaskNo: Code[20]): Decimal
procedure RemainingQty(ProjectNo: Code[20]; ProjectTaskNo: Code[20]): Decimal

Rules:

  1. PlannedQty returns the task's budgeted quantity: the sum of Quantity over its project planning lines whose Line Type is Budget or Both Budget and Billable. Billable-only lines are estimated invoicing, not budget — they must not count.
  2. PostedQty returns the total quantity actually posted as usage on that task. Entries written by invoicing (entry type Sale) must not count.
  3. RemainingQty returns planned minus posted. It goes negative when more was posted than planned — a task with usage but no plan at all reports minus its posted quantity, and its PlannedQty is 0.
  4. Every figure is scoped to the (project, task) pair: another task on the same project, or a task with the same task number on a different project, must never leak into the result.
  5. The figures must be correct whether or not the project uses the "Apply Usage Link" setting — the grading tests build both kinds of project.

Pick object IDs in the range 50100–50199, and reference base application objects by name, never by ID.

What the tests check

The tests build real projects with the standard library: project tasks, planning lines of each line type, and usage posted through the project journal — sometimes several postings on one task, sometimes a fraction of the plan, sometimes usage on a task that has no plan, and sometimes a negative usage posting (a correction) that must reduce the posted figure. Decoys are everywhere: a second task on the same project, a second project whose task carries the identical task number, a Billable planning line, and Sale ledger entries of either sign — none of them may move your numbers. Some fixture projects apply the usage link and some do not; the expected planned/posted/remaining values are asserted exactly on both kinds.

Learn More

Hint 1
Plan and actuals live in different tables: the plan on Job Planning Line, every posting in Job Ledger Entry. Ask which table each of your three figures should read — and notice which figures the tests say are wrong only on some projects.
Hint 2
The planning line's "Qty. Posted" and "Remaining Qty." are maintained by the usage-link machinery, and that machinery runs only for projects with "Apply Usage Link" switched on. On a project without it those fields sit at 0 and at the full plan forever, while the ledger still records every posting.
Hint 3
Sum Quantity over the task's Job Planning Lines with Line Type Budget or Both Budget and Billable for planned; sum Quantity over its Job Ledger Entries with Entry Type Usage for posted; remaining is the difference. Filter both tables by project no. AND task no.
ALBusiness Central 28.5
Press Compile to check your code compiles — Submit runs the tests.
The code editor is desktop-only
Open this problem on a computer to write and run code. Reading the description, tests and discussion works fine here.